Showing posts with label snag list. Show all posts
Showing posts with label snag list. Show all posts

Monday, 20 October 2008

MFI - No Response

The installations manager has not had the common decency to return the voicemail. We've given her a week - but then haven't we just been giving them break after break for the past 5 months.

SINK
We have now discovered a hairline crack running through the sink 2 inches out from the tap base - this would not have been immediately apparent due to it being pristine, but over the past few weeks I guess dirt has got in the crack so it is now visible.

FRIDGE/FREEZER alignment
Fitters4 spent a long time messing about with the alignment of these units. And now they turn round and say that it's the fault of Fitter1 who should have noticed the warp in the worktop so it could have been replaced, and who fitted the whole base structure seemingly without the use of a spirit level.

The doors are not operating smoothly, open the doors and it's blatantly obvious they're not straight, plus there's that awful inverted V gap at the wall end panel.

- - -

Happy birthday - not - to the Remedial Work
... now 5 months old!!!

I've done a quick search on the internet and apparently we are supposed to be noticing some things...

Development Milestones at 5 Months :

* Sit, if supported, to view the world. - yeah it sure needs support
* Start to connect eyes and fingers, co-operate in reaching and grasping. - connection & co-operation never seem to have been a strongpoint
* Make sounds and interrupt conversations when wanting attention. - it certainly sneaks into conversations
* Display an awareness and wariness with strangers. - yesss, how many fitters have we had now
* Babble double consonants such as baba, dada, mama.
- certainly leaves us babbling incoherent wrecks

Tuesday, 12 August 2008

Remedial work: Friday 8 August 2008

NEW SNAGS!
Fitters4 have discovered the following additions to the original snag list:
24. Isolator valves were not fitted to the sink feed pipes. They've now done that.
25. Seals were not fitted to the bases of the plinths. They've identified what the spare plastic thing is.

Remedial work done on Fri 8-Aug-08:-

a) End panel reinstated on wall unit, now fitted close to wall eliminating gap. Door handle sorted.
SNAG: The bottom corner of the end panel is dented and looks rounded instead of right angled as it should be.

b) Base unit incorporating new Franke sink, door handle and replacement counter end worktop reinstated; pipework under sink tidied up. Edging seal fitted at other (cooker) end of worktop.
SNAGS:
1. U-BEND MISFIT: Fitters4 found that the U-bend does not fit to the outlet properly; so they've forced it hard up against the side of the unit to get it to meet the plug outlet, so it's slightly angled as a result. They said that was causing a leak, so they've left a bowl to catch the drips and say they will obtain a more suitable telescopic U-bend. They should've come & told me that they would not be using the Franke connecting and waste kits supplied.They should've measured up for their solution, too. The sink should've been at least another inch to the right to make their solution fit (moving the sink to the right was one of the original solutions discussed with Fitters 2 & 3 in any case).
2. LEAK: We have found that it is NOT just the U-bend that is slightly leaking. The joint/seal of the filter tap is leaking worse.
3. MISSING FRANKE CONNECTOR KIT: This was supplied with the sink and should've been left in the box (with the opened Franke waste kit) but was nowhere to be seen at the end of the day.
4. POOR CUTOUTs: The cutouts for the sink are mismatched to a very visible extent.
5. SINK SEALANT: Gap under edges of new sink, requires more sealant to eliminate dirt trap. Fitters4 also took the remaining Duropal sealant with them.
6. NO SINK CLIPS: They were unable to get the clips to fit & are sourcing alternatives.
7. LOOSE water TAP: The taps themselves are ok, but the central water spout is very loose.
8. Hot tap has a flexible feed; cold tap does not.
9. MISALIGNED UNITS: each unit is slightly off kilter to the one next to it, leaving a step effect where the worktop sits, and the bottom shelf inside each misaligned to the frame.
10. WORKTOP JOINT still standing proud.
10. WORKTOP: Edging seal tape to be fitted at cooker end of remaining worktop.
11. WORKTOP: Refit edging brackets either side of cooker so they don't protrude out.

c) Footings fitted on floor to ceiling unit.
SNAG: OMG they look awful. Truly awful. They're a totally different colour (and I mean TOTALLY!) and should have at least had some beading or wooden seal across the join to mask it. One is slightly misaligned too, so it has a more noticeable gap where it meets the main panel. Plus they should've pulled the vinyl flooring away.

Still to do:-
1. Realign fridge & freezer (fridge door slight misfit).
2. Lower cooker height.
3. Fit shelf in sink base unit.

OTHER ISSUES
a) Socket covers that were unscrewed by the plasterer do not screw back onto their casings due to the plastering. One of the sockets hisses when the cover comes back close.
(nb. The plastering curves outwards as it reaches the worktop. This is going to make tiling difficult.)
b) Extractor fan joint box is lying loose on top of the wall cupboard. The box and its wires should have been fitted back into the wall.
c) 2 months warranty has been lost on the appliances by MFI submitting registration too early and without asking. We want those 2 months back.
d) The fact still remains that we were missold on this kitchen right at the outset, because it does not meet the brief: ie. wall units which, when fitted at the correct standard height relative to the worktop, meet the ceiling.

ON THE BRIGHT SIDE...the tap doesn't spit madly out like an irate customer.

Thursday, 31 July 2008

6 Reasons why the Wall Units are Still Not Right

1. Fuse box hanging out (pic in previous post)
2. Gap at back of unit (pic in previous post)
3. Big gap between units as shown below - you can also see how the wall sockets were left in this pic. The cornices also have slight gaps. There is a plastic seal left unused from the cornice boxing.

4. Door does not close properly

5. Handle on ill-fitting door is loose; this is down to a faulty product and Fitters4 have said they have added the item to the reorder list.

6. Internally, the units are slightly misaligned to the frames so the bottom shelf looks out of skew.

Sitrep
Email: IM is waiting on delivery info for panel, then we will get dates for Fitters4 to come back.
No mention of delivery of replacement handle.
It's now 2 and a half months since the kitchen install began.

Saturday, 14 June 2008

Amityville - brace yourselves here's The Snag List

When MFI's saleswoman told me that MFI actually could offer me a range that would go up to my ceiling with no annoying dusty gap, I conceded that my search was over.
I gave her my room height at the design stage, as I also wanted her to incorporate a customised floor-to-ceiling unit (involving a stack of wall units) on an opposing wall.
Now that the fitters (whom I shall index as Fitter1) have been and gone (twice), the following is a list of all the things that have gone and/or are still wrong with our MFI fitted kitchen:
1. Wall units damaged. The backboard on one was cracked, and another was scratched. Fitters claimed it was not them, that it was probably done in transit and that they never noticed any damage anyway during work until I pointed it out to them. (Aren't they the ones who are supposed to have the trained eyes?)
2. Unacceptable discolouration on wall unit. I'm intelligent enough to know that wood has natural hues and variations, but this looks like it's gone 10 rounds with a flame thrower. It should never have passed factory standards inspections - if, indeed, MFI operate such a process.
3. Cooker hood is misaligned and touches the wall cupboard on one side, causing vibrational stress to the unit and rendering any attempt to clean down the side of the hood impossible.
4. Base level fridge & freezer are misaligned - the front doors & end panels look like they're all sloping in different directions.
5. Standalone cooker misfitted so it touches the unit at the side (fridge) causing vibration from the cooker fan.
6. Mess. Pan drawers were not removed when the fitters came back to fit the worktop, so they were full of dirt & sawdust afterwards.
7. Closure faults. All units are supposed to have the 'soft close' mechanism but the pan drawers & a cupboard do not close & need to be helped.
8. Cupboard under the sink - what a disaster.
a) Huge holes have been gouged into the top end of this unit for no apparent reason.
b) Lots of wrong holes were drilled into the backboard before they guessed right on ones that would actually accommodate the plumbing furniture. There are even mysterious great gaps gouged out of the top of the back board that have no obvious purpose.
c) Filter tap cartridge has been left lying around loose, no bracket fitted.
d) Plumbing & pipes for dishwasher & sink are left hanging right through the middle - inadequately fitted & bracketted. Space is subsequently unuseable.
e) Door misfitted, stands proud of unit.
f) Handle missing!
9. Mini end cupboard next to sink cupboard - handle was also missing off this one and so, without asking, the fitters used their initiative (great) and took the one off a sample door in our washroom that I'd left a £5 depost with MFI for a couple of months back when I'd borrowed it for tile matching. (Ho hum.)
10. Electrics.
a) The electrician made a mess in the hall when he fitted wiring to comply with building regs requirement for a ring main. He never covered the carpet and did a poor job of wiring into our main switch box generally.
b) Sockets/switches in the kitchen that were moved now stand proud of the wall because they have been badly fitted.
c) An end wall had been perfectly plastered. I had asked Fitter1 beforehand about the socket that needed moving and he said to get the wall done and they would move it later - not to worry, the patch would not be visible. Ha! It looks like a lump of blancmange on my otherwise pristine wall. Incorrect filler used, should have been plastered.
d) Fuse switch next to the cooker hood is totally in the wrong place.
11. Unuseable walls: When surveying and subsequently stripping the walls, the fitters never indicated that we would need some plaster & skim work to the wall prior to the wall units & cooker hood going up. The wall they uncovered is in a dreadful state, and they have just mounted everything on top of it so we are now unable to plaster, decorate or tile over it. What filler they did use on the boarded-up alcove was inappropriate & has left more of a problem than it solves.
12. Worktop. As I wasn't taken with any of the MFI worktops, I bought a top-of-the-range Duropal laminate worktop from Blacksheep (Macclesfield) which is superb. Or at least it was.
a) It has been severely hacked into under the sink by the fitter, comprising its structural integrity and capacity to support the sink.
b) The fitters have not applied the laminate covers to the edges of the worktop at the break where the cooker stands. They've put standard MFI metal brackets on the ends which do not sufficiently covered the laminate inner , so leaving the 2 front corners there vulnerable to liquid ingress - fatal for laminate! You can see the compacted 'inner' sticking out the sides of the metal end pieces.
c) They have executed a very poor 'invisible' join at the L-shape in the corner; the silicon-filled gap is wide enough to allow deterioration of the seal and one side stands higher than the other which is visible at the corner itself.
d) The sealant itself appears to be sub-standard and everyone that has seen the kitchen since (including other MFI fitters) have said the wrong type of sealant has been used.
13. Sink.
a) The finish on the matt sink is impossible to clean. Wiping it brings up a blackened hue, and water 'pools' all over the surface causing blotches.
b) Inadequate silicon sealing around the sink - there are obvious gaps in the sealant. If any water gets in there, it will leak underneath and also wreck the inside of the worktop.
c) Filter tap spits, there's no smooth flow to the water. No matter how you try to turn the tap nozzle, the water just spits out uncontrollably to the sides. Poor product design.
d) Ponding on the drainer.
14. Sub-standard plastering. The filler/plaster used to 'make good' the wall where the alcove is boarded up, and at various places over the rest of the wall (including the moved socket - ref.10c) is sub-standard and has been put on very badly. It looks like cheap polyfiller and no attempt has been made to smooth it over, even high up on the wall where tiling is least likely to be.
15. Boarding-in of water pipes that run up the corner of the kitchen has been very poorly done. The ply has not been cut accurately and there is no support on one side - so the whole thing looks awful, is not secure and cannot be decorated over. A very unprofessional job.
16. Floor to ceiling unit has no base boards! It looks like it's just 'floating'! If you bend down you can see the support feet that are supposed to be hidden.
17. Scratch on end plate where the sink cupboards finish.
18. Fridge is missing a top protector plate from the door fittings. When the fitters left, they took a bag of unused stuff (screws, brackets, etc) which included the unfitted fridge piece. I had gathered all this up myself, expecting to keep it and of course fit the fridge piece!
19. No paperwork, forms or certificates were left for any electrical and gas fitting work carried out, or any aspect of the fitting itself. Legal point.
20. Appliance warranties only 10 months. MFI register the product themselves ahead of fitting. I discovered that my appliances were registered back in March. That only leaves 10 months' warranty period post-install.
21. Plinth drawer unuseable. The fitters were unable to fit this new-style drawer into the base plinth, they said it just wouldn't fit and I should take it back for a refund, which I did.
22. My bag of bits has gone for a walk. (As has my gorgeous, blue flowery, big mug... and both disappeared around the same time. Just a coincidence?) The fitters left a lot of rubble in the kitchen - screws, brackets & other fittings dotted around the place & inside the cupboards. I collected the whole lot up and put it all in a pink carrier bag in a corner of the kitchen for keeping safe. I never saw it again.
23. And finally....The piece de resistance!!!....
The wall units do NOT reach the ceiling!
Despite giving MFI the room height measurements at the design stage, I was not informed that the ceiling height would render my requirement undeliverable, and that using 'gap filler' in this instance was untenable due to the size of the gap involved (half a foot).
I was therefore MISSOLD in the first instance.
As a footnote, the cupboards themselves are simply a waste of space. There's not enough room in them and the shelves I wanted have not happened, so we've had to order another wall unit. :-(
Recourse:-
The following are the steps I am taking...
a) formal complaint with MFI Macclesfield.
This is where we are now. The manager rang up and has sent one of his expert fitters (Fitter2) to survey the kitchen & submit a report, as understandably he does not have the 'trained eye' to do that himself. Apparently he is new to the branch, and so far I have found his verbal response to the matter to be positive and proactive. It would be so nice to be able to blog an entry for an excellent resolution! However, Fitter2 mentioned during his visit that he personally would be not available for a re-fit until September, and he can't book us in even provisionally until he gets management instruction to proceed, so that will probably push out to even later. This is a major issue as far as I'm concerned, such a wait is unacceptable.
Since that report was done there has been no further communication to us from the branch.
b) Further action as events shall warrant.
Personal reflection
I get a sick feeling in my stomach every time I have to face the horror story that is my MFI fitted kitchen. When I pull into the drive after a long day at work, having collected my son from school, all I want to do is make a nice meal for us all and have a rest. Instead it just upsets me to walk in there, and I'm ending up with more migraines & depression. We are expecting a visitor from the US at the end of September, how the hell can we welcome anyone into this horror story.
FOOTNOTE: Howdens and MFI are joined at the hip. Check Wikipedia and bear this in mind when shopping around.